Robotic load and unload of furnaces, quench tanks, and induction stations — consistent placement and timing on high-mix parts, reconfigured in software per part number.
The dexterous, high-mix, contact-rich jobs are exactly the work classical automation was never built to hold — and the people who used to absorb it are getting harder to find.
Furnace and quench tending is high-heat, burn- and strain-risk work. Automating it pulls people away from the hot zone and the manual transfer of hot, heavy parts.
Soak and quench timing drive the metallurgy. The cell holds transfer and quench timing every cycle, so results stay repeatable instead of drifting with the operator.
Every load, soak, and quench is logged part by part, turning a hard-to-audit process into a documented one for quality and compliance.
One cell, reconfigured per part — not a new machine for every job on the floor.
Place and retrieve parts from batch and continuous furnaces on consistent timing.
Move parts to quench on repeatable timing to hold the intended metallurgy.
Load and index parts through induction hardening stations.
Load baskets, trays, and fixtures to pattern for batch processing.
Move hot parts between stations without manual handling in the heat.
Log load, soak, and quench timing on every part for traceability.
The slow, hard engineering happens on our floor — so the cell arrives tested and dialed in instead of tying up your team for months. A new part is a reconfiguration, not a rebuild.
Arm, sensing, tooling, software, and safety, selected for your part and qualified as a set.
Arm and tooling selected for your part, qualified as a set.
Finds the part, adjusts in real time, verifies its own work.
A new part is a reconfiguration, not a rebuild.
Guarding sized to your floor, failures explained in plain language.
Representative configuration. Final specs are issued with the proposal.
We started Relling to help American manufacturers make more of what this country needs. We'll scope projects to your needs and quote you so that your ROI typically closes within 24 months.